Water infrastructure that follows your programme

Plots stand finished and unserviced while a connection date sits in somebody else’s queue. Self-lay puts the water network back on your build programme — designed, installed, certified and adopted by one accredited contractor.

Planning a development?Send us your site layout or utility drawings and we will review the water requirements with you.

The sector

The water connection is rarely hard. The waiting is.

On most schemes the on-site water network is not technically demanding. What costs money is the queue: waiting for the incumbent to design it, waiting again for them to programme it, and watching completed plots sit unserviced because one connection has not happened.

As an accredited Self-Lay Provider we install that network to the standard the adopting company will adopt, coordinate the design through to approval, manage the application and the inspections, and hand over an asset with the records adoption actually requires. The work happens when your build needs it.

We have delivered developer-led schemes alongside NAV operators including Albion Water, and the same team handles the mains, the ducting and the connections rather than three subcontractors and a coordination meeting.

Why Cascade

One accountable contractor, from feasibility to adoption.

Developer water schemes fail in the gaps between designer, groundworker and certifier. Here they are the same organisation.

  1. 01

    Accredited Self-Lay Provider

    LRQA WIRS accredited, independently assessed, to undertake eligible self-lay and contestable works within our accredited scope — so the network is built to be adopted.

  2. 02

    Experience with NAV operators

    We have delivered schemes working with NAV operators including Albion Water, so the NAV route is a process we have been through rather than one we have read about.

  3. 03

    Pre-qualified before the tender lands

    SafeContractor, SMAS Worksafe, Acclaim, Constructionline Gold and Achilles UVDB Silver Plus — getting us onto a site is not a three-week exercise.

  4. 04

    Records produced as we go

    As-built drawings, pressure test results and sampling certificates compiled during the work. Adoption is refused for missing paperwork more often than for defective pipework.

  5. 05

    Phasing designed in, not retrofitted

    Valve positions and temporary supply arrangements decided at design stage, so plots can be released as they complete rather than all at the end.

Independently assessed

Full accreditation detail on the about page.

Development enquiry

Send the site plan and the dates you need water by.

A layout and a programme are enough for us to tell you whether self-lay or NAV is the better route, and whether the dates you have in mind are realistic.

Or reach us directly

Burst main or major leak? The freephone line is answered 24 hours a day.

Request a quote

Site layouts, utility drawings, correspondence or photos of the problem. Up to 5 files, 15MB in total — PDF, JPG, PNG, HEIC, DWG or DXF.

We use these details to answer your enquiry and nothing else.