Water Mains

Illegal Shared Water Supply Replacement

Hitchin, Hertfordshire

Project overview

Cascade Water Services was appointed by their client to replace three illegal shared water supplies serving a mixed-use development at Bucklersbury in Hitchin, Hertfordshire.

The site comprised a combination of residential apartments and commercial premises that had previously been converted from a single building. During historic redevelopment, multiple properties had been connected to one incoming water supply using shallow 20mm plastic pipework that did not comply with current water industry requirements.

Affinity Water required the illegal supplies to be removed and replaced with individual metered connections to each property. The project required considerably more than standard connection works. Cascade was responsible for developing the construction methodology, coordinating all stakeholders, obtaining approvals, managing traffic management and delivering the entire scheme within tightly controlled overnight working hours.

The client’s challenge

The existing infrastructure presented several engineering and logistical challenges. Three illegal shared supplies were feeding numerous residential and commercial properties from one incoming connection. Individual properties could not be separately metered, creating ownership, billing and future maintenance issues.

The existing pipework had been installed at shallow depth using multiple 20mm branches from a single supply, leaving the installation below current regulatory standards. Because the works were located within Hitchin town centre, excavation could only be undertaken during restricted overnight working windows.

The project also required:

  • Maintaining supplies to occupied homes
  • Minimising disruption to businesses
  • Coordinating with Affinity Water
  • Managing local authority approvals
  • Implementing full road closures and diversion routes
  • Working around existing underground utilities
  • Completing every shift with the highway safely reopened before the morning traffic

Our solution

Cascade Water Services managed the project from initial planning through to final completion. Following detailed site investigations, we developed a complete programme of works and prepared all required Risk Assessments and Method Statements (RAMS). Our team led meetings with the local authority, coordinated stakeholder communications and worked closely with Affinity Water to agree on the construction methodology before work commenced.

Private-side works were completed first, installing thirteen new supply pipes to the boundary and onward to each property’s point of entry. Existing utilities prevented trenchless installation in some areas, so carefully planned trench excavations were used instead to protect underground services while minimising disruption.

The public-side connections were then undertaken under a Temporary Traffic Regulation Order (TTRO) using full road closures, diversion routes and parking suspensions. Each evening, works commenced at 21:00 with specialist contractors working together as a coordinated team, including vacuum excavation, grab lorries, excavation plant and reinstatement crews. Every morning the road was fully reinstated, made safe and reopened before 06:00.

New manifold assemblies were installed to provide dedicated metered supplies to each individual property. Due to the existing water main being only approximately 350mm deep, Cascade worked with Affinity Water’s operational and developer teams to agree on an engineered solution that achieved compliance while avoiding unnecessary fittings. Protective meter plating was also installed above the shallow pipework as part of the agreed design.

The project concluded with the installation of new individual supply pipes through to the internal stop taps of each property, delivering a fully compliant network for both residential and commercial occupiers.

Challenges overcome

This project required considerably more than engineering installation. The town centre location demanded extensive planning to coordinate traffic management, parking restrictions, pedestrian access and commercial operations while maintaining access for residents wherever possible.

Working overnight significantly reduced disruption but created a demanding programme. Every activity had to be carefully sequenced so excavation, pipe installation, testing, backfilling and temporary reinstatement could all be completed before the road reopened each morning.

Existing underground utilities also restricted installation methods on the private side, requiring trench excavation rather than impact moling in selected areas. Throughout the project, Cascade maintained continuous communication with Affinity Water, the local authority, residents, businesses and specialist subcontractors to ensure every phase progressed safely and efficiently.

Outcome

The project successfully transformed an outdated and non-compliant water infrastructure into a fully compliant, individually metered system. Each residential and commercial property now benefits from its own dedicated water supply, improving ownership, maintenance responsibility and future resilience.

The works were completed safely, on programme and within budget despite the complex operational constraints. Most importantly, the project generated no complaints from residents, businesses or stakeholders throughout the delivery period.

Following completion, Affinity Water formally accepted the installation, issued approval and closed the illegal connection case, providing the client with confidence that the infrastructure now meets modern water industry requirements.

Technical highlights

  • Three illegal shared water supplies removed and capped off at the main
  • One new 63mm connection with a 6-port manifold
  • Two new 50mm connections with 4-port manifolds
  • Thirteen new private-side supply pipes installed
  • Individual metered supplies provided
  • Private supply replacement to internal stop taps
  • Temporary Traffic Regulation Order (TTRO)
  • Full overnight road closures and diversion routes
  • Vacuum excavation used around existing utilities
  • Coordination with Affinity Water throughout
  • Completion reports and certification issued
  • Affinity Water approval obtained following completion
Project type
Illegal water supply replacement
Sector
Mixed residential and commercial
Water company
Affinity Water
Pipe sizes
63mm and 50mm
Private supplies
13
Traffic management
TTRO, road closure, diversion
Working hours
Overnight, 21:00 to 06:00
Discipline
Water Mains
Location
Hitchin, Hertfordshire

Similar job?

Tell us what you are dealing with.

Most of what we do looks like one of these. Describe the property or the site and the right engineer picks it up.

Or reach us directly

Burst main or major leak? The freephone line is answered 24 hours a day.

Request a quote

Site layouts, utility drawings, correspondence or photos of the problem. Up to 5 files, 15MB in total — PDF, JPG, PNG, HEIC, DWG or DXF.

We use these details to answer your enquiry and nothing else.